Sprint View


Report Description

The Sprint View report shows a matrix of the Sprint Backlog Items allocated to a Sprint, against the working days included in the Sprint

By default, the report shows the current Sprint. However, the report is parameterised so that any sprint can be chosen. A second parameter allows data to be filtered by Team. Ordinarily, Saturdays and Sundays are excluded from the report, but a parameter is provided to include weekends for situations where they are being worked.

The report may be physically quite large, and is intended to be printed out on A3 paper or larger, or projected onto a wall or whiteboard.


Report Parameters

Parameter Description Default
Sprint Select the desired Sprint The current in progress Sprint
Team A multi-select dropdown providing the ability to filter the backlog items by a specific team or subset of teams All backlog items, including items assigned to specific teams and those that are unassigned
Weekends Selects whether weekends are included as valid working time or excluded from work time Excluded


Screenshot