Bug Resolution Time Chart


Report Description

This report shows how fast bugs are being resolved from the date they are discovered. The "Iteration" and "Team" dropdowns allow the view to be adjusted from the entire project down to a specific Sprint and Team.

The speed with which bugs are resolved is a joint responsibility between the Team and the Product Owner. The product Owner must prioritise the resolution of bugs over building more features and the team must efficiently diagnose and implement the resolution. The Bug History chart will show bugs building up over time, illustrating that the team and Product Owner are getting into "Bug Debt".


Report Parameters

Parameter Description Default
Iteration Use this parameter to filter the view duration from the entire project, to a specific Release or Sprint Defaults to the current Release
Team A multi-select dropdown providing the ability to filter the bug data by a specific team or subset of teams All bugs, including those assigned to specific teams and those that are unassigned
Weekends Selects whether weekends are included as valid working time or excluded from work time Excluded