Bug Resolution Time Chart
Report Description
This report shows how fast bugs are being resolved from the date they are discovered. The "Iteration" and "Team" dropdowns allow
the view to be adjusted from the entire project down to a specific Sprint and Team.
The speed with which bugs are resolved is a joint responsibility between the Team and the Product Owner. The product Owner must prioritise
the resolution of bugs over building more features and the team must efficiently diagnose and implement the resolution. The Bug History chart
will show bugs building up over time, illustrating that the team and Product Owner are getting into "Bug Debt".
Report Parameters
| Parameter |
Description |
Default |
| Iteration |
Use this parameter to filter the view duration from the entire project, to a specific Release or Sprint |
Defaults to the current Release |
| Team |
A multi-select dropdown providing the ability to filter the bug data by a specific team or subset of teams |
All bugs, including those assigned to specific teams and those that are unassigned |
| Weekends |
Selects whether weekends are included as valid working time or excluded from work time |
Excluded |
Screenshot